Latest news
New Building

New Building

1 min read
January 23, 2025
Our New Facility: Built to Help You Grow

At Coolpak, we’re all about finding innovative, practical solutions for our clients — and we have designed our brand-new facility to do just that.

Our recently opened new building sits adjacent to the main Rolleston facility and adds 4 x 50-tonne blast freezers, packing rooms, and a considerable area for sorting and grading.

Our purpose-built space is flexible, efficient, and adaptable to a range of needs, ensuring we can meet our clients’ unique requirements.

  • Our four high-capacity blast freezers can handle up to 200 tonnes of perishable food items at any given time, ensuring their freshness and quality.
  • A dedicated sorting and grading area, currently focused on meat, but adaptable for other products depending on what you need.
  • A purpose-built room for butter repack, designed to be flexible and easily adjusted for other client requirements.
  • A 2,000-pallet-position storage facility, making it simple to manage and move products.

What does this all mean for our clients?

When they bring us a challenge, we find a solution. Whether creating a new space, refining a process, or finding smarter ways to move products from plant to port, we’re committed to success.

We’ve also planned for the future, with room to grow and expand alongside our clients. If you need something tailored to your business, we’re always happy to discuss it.

At Coolpak, it’s simple: you bring us the problem, and we’re always ready to provide the solution. Your challenges are our opportunities to excel.

You might be interested in
Coolpak Rain Water 1
Rainwater Harvesting
Latest news
1 min read
November 5, 2024
20230203 111446 002
Automated Cold Store
Latest news
1 min read
November 1, 2024
Container Pod packing 002
Container Loading Docks
Latest news
1 min read
October 9, 2024